How long does it take to build an app?

Short answer

At Apptractive, a simple app or tightly scoped MVP takes 1–2 months from kickoff to launch. An app with accounts, payments and an admin panel takes 3–4 months, and large apps like marketplaces take 5 or more. These estimates cover one React Native build for iOS and Android, including design, testing and App Review. Store accounts can add weeks, so start them on day one.

1 – 2 monthsSimple app or MVP
3 – 4 monthsApp with accounts, payments and an admin panel
4 monthsPantry Pic, first commit to both app stores

How long does each type of app take?

These are our planning estimates at our Sydney studio. The clock runs from kickoff to live on both stores, with one React Native codebase for iOS and Android.

They assume a dedicated team, one decision-maker on your side and feedback within a couple of days.

Apptractive planning estimates, kickoff to launch
App typeWhat it usually includesTimeline
Simple app or MVPOne core feature, sign-in, a simple backend, 10–20 screens1 – 2 months
Medium appAccounts, payments or subscriptions, an admin panel, a few integrations3 – 4 months
Large appSeveral user types, a marketplace, real-time features, AI, complex integrations5+ months

An MVP means a small first release, not a simple product. A marketplace MVP with buyer and seller accounts, payments and payouts usually sits in the large band.

Other Australian studios publish similar or longer ranges. WebAlive’s 2026 guide gives 1–3 months for simple apps, 3–6 for mid-level and 6–12+ for complex ones.

Taking over an existing app starts differently. We do a code audit first, usually 1–2 weeks, then plan and quote the work. Our app development cost guide has the dollar figures for each size.

What happens in each phase?

This is a typical medium app. The phases overlap, which is how 12–21 weeks of phases fit into 3–4 months.

Phases of a medium app build
PhaseWhat happensTypical timeWhat you do
RequirementsA workshop to list every screen, feature and user type, then a quote for the full build1 – 2 weeksAnswer questions, decide what’s in version 1
DesignUser flows, then the screens, reviewed with you2 – 4 weeksGive feedback within a day or two
DevelopmentThe app, backend, payments and integrations, shown to you every week or two6 – 10 weeksTest builds on your phone, supply content
Testing and betaQA on real iPhones and Android phones, then a beta with real users2 – 3 weeksRecruit beta testers, report bugs
Store submissionListings, screenshots, privacy details, App Review and fixes1 – 2 weeksApprove the listing text and pricing

Our development process page shows how each phase runs with us.

A 16-week schedule, week by week

How the phases overlap on a medium app
WeeksMain workMilestone
1 – 2Requirements workshop, store accounts startedSigned-off feature list and quote
2 – 5Design, starting with the core flowDesigns approved
4 – 13Development, backend first, then screensA test build on your phone every week or two
12 – 14Testing on real devices, beta with real usersBugs fixed, beta feedback in
15 – 16Store listings, submission, App ReviewApproved on both stores

Development starts before design is finished. The backend doesn’t need final screens, and the core flow is designed first.

What do real projects look like?

Two of our own products show both ends of the range. Both clocks start at the first commit, so they leave out earlier research.

Apptractive projects, first commit to launch
ProjectWhat it isTime to launch
Pantry PiciOS and Android app with AI photo detection, recipes, accounts and subscriptions4 months (May to September 2025)
yourwedding.appWeb platform with guest sites, RSVPs, payments and SMSUnder 3 weeks

yourwedding.app was our own product, so there was no client approval loop. The scope was tight, and it reused the AWS setup from our earlier projects. Don’t plan on that pace unless your scope is just as small.

Read the full Pantry Pic case study for how the AI detection and subscriptions were built.

How long do the App Store and Google Play accounts take?

Identity and business checks can hold up a finished app. Start store enrolment in week one, while design is happening.

Store account requirements as of October 2026
AccountWhat it needsLead time
Apple, individual or sole traderAn Apple Account with two-factor sign-in, and the US$99 yearly feeUsually the quickest. Your personal name shows as the seller
Apple, companyA legal entity like a Pty Ltd, a D-U-N-S number, a website on your own domain and a work email on itD-U-N-S: up to 5 business days, then up to 2 more to reach Apple. Apple then verifies the company
Google Play, personal (new)ID verification, the US$25 one-off fee, a real Android phone, then a closed test with 12 testers for 14 daysAt least 14 days of testing, then a production access review
Google Play, organisationA D-U-N-S number, details matching your D&B profile, the US$25 one-off feeGoogle says a new D-U-N-S can take up to 30 days

Apple accounts for Australian businesses

Apple asks companies for a D-U-N-S number registered to the legal entity. It’s free from Dun & Bradstreet. Check whether your company already has one before you request it.

Apple doesn’t accept business names or trading names. A sole trader with an ABN enrols as an individual, so the App Store shows their own name as the seller. To sell as a business, you need a legal entity such as a Pty Ltd.

Apple also checks that your website and email use your company’s domain. A social media page or a parked domain won’t pass.

Google Play’s closed testing rule

Personal Google Play accounts created after 13 November 2023 must run a closed test. You need at least 12 testers opted in for 14 days in a row. A tester who leaves and rejoins starts their own 14 days again.

After that you apply for production access. Google asks how testers used the app and what you changed. It says that review usually takes 7 days or less, but can take longer. The closed test can run during the beta, so it doesn’t have to add weeks if you start early.

New personal accounts must also verify a real Android phone in the Play Console app. Organisation accounts need a D-U-N-S number instead, and the closed testing rule is written for personal accounts.

How long does App Review take?

Apple says it reviews 50% of submissions in under 24 hours and 90% in under 48 hours. Google doesn’t publish a typical time. It says reviews for certain accounts can take up to 7 days or longer in exceptional cases.

Rejections are common. In 2025 Apple reviewed more than 9.1 million submissions and rejected over 2 million, more than 1 in 5. Over 1.2 million of those were new apps. A rejection can mean changes and a resubmission, so leave a week in the plan.

  • No way in. Guideline 2.1 asks for a demo account or demo mode, and for your backend to be live during review.
  • No account deletion. Guideline 5.1.1(v) requires users to be able to start deletion in the app if they can create an account.
  • Wrong payment method. Guideline 3.1.1 generally requires in-app purchase for digital features and subscriptions.
  • Too thin. Guideline 4.2 rejects apps that are little more than a repackaged website.
  • Social login without an alternative. Guideline 4.8 covers third-party logins used to create or sign in to the main account. It asks for a privacy-friendly option too, like Sign in with Apple. There are exceptions, such as company sign-in systems.

The full rules are in Apple’s App Review Guidelines. If your launch is tied to an event you’re directly part of, Apple lets you request an expedited review. Don’t rely on it.

Which rules add time in Australia?

Privacy and store rules add design and testing work. Plan them into the first weeks, not the week before submission. This isn’t legal advice.

  • The Privacy Act. It covers businesses with turnover over $3 million and some smaller ones, such as health service providers. Map what personal data the app collects during requirements.
  • Automated decisions. From 10 December 2026, APP entities’ privacy policies must cover some automated decisions that use personal information and could significantly affect people. The OAIC’s guidance explains when it applies.
  • Store privacy forms. Apple’s privacy details and Google Play’s Data safety form must match what the app and its SDKs actually collect.
  • Account deletion. If users can create an account, Google Play wants an in-app path and a web link for deleting the account and its data.
  • Australian Consumer Law. Where the consumer guarantees apply, services must be supplied in a reasonable time if no timeframe was agreed. Put milestone dates in the contract.
  • AI features. Apple’s guideline 5.1.2 says you must disclose when personal data goes to third-party AI and get explicit permission first. That’s a screen to design, not a line in the privacy policy.

What slows an app down?

  • Slow decisions. Feedback that blocks the next step adds that time to the end.
  • Scope that grows mid-build. New ideas are good. Put them in phase 2.
  • Store accounts started late. See the table above.
  • Third parties. Payment provider checks, API access and partner contracts can block development or release while approval is pending.
  • Content nobody owns. Product data, legal terms, help text and store screenshots need a name next to them.
  • Platform deadlines. Since 28 April 2026, Apple needs apps built with Xcode 26 or later. Since 31 August 2026, new Android apps and updates generally need to target Android 16. An old codebase may need upgrading first.
  • Holidays. Many Australian businesses, testers and partners are away from Christmas to mid-January. Confirm everyone’s shutdown dates early.

How do I plan backwards from a launch date?

Start from the date and subtract. Here’s a medium app aiming to launch on Monday 15 March 2027.

  1. Count the build. The 16-week schedule above runs from kickoff to approval on both stores.
  2. Add the summer break. Assume 2 weeks over Christmas and New Year, then confirm the real dates.
  3. Add 2 weeks of buffer for a rejection or a late change.
  4. That’s 20 weeks. Counting back from 15 March 2027, kickoff lands on Monday 26 October 2026.
  5. Request the D-U-N-S number and start the store accounts in week one.
  6. Start the beta on Monday 25 January. If you use a new personal Google account, run the closed test as part of it. 14 days of testing plus up to a week for Google’s review clears by 15 February.
  7. Submit to both stores in the week of 15 February. Approval by the end of February leaves 2 weeks of buffer.
  8. Set the Apple release to manual, so you choose the day. Allow up to 24 hours for it to appear. Google’s managed publishing isn’t available for a first release, so plan the Android go-live separately.

If the date can’t move, the scope has to. Cut features from version 1 rather than squeezing testing. Launch isn’t the end either. Plan for monitoring and a first update in the weeks after.

How can I launch sooner?

  1. Cut version 1 to the smallest complete workflow that solves the main problem.
  2. Build one cross-platform app instead of two native ones. Our React Native page explains why.
  3. Use managed services for sign-in, payments, subscriptions and email.
  4. Name one person who can make decisions, and book a weekly check-in.
  5. Create the store accounts and gather content while design is happening.
  6. Write a short brief before the first meeting. Our app brief template shows what to include.

A team in your time zone helps too. We work Sydney hours from North Bondi, so feedback you send in the morning can be acted on the same day.

Common questions

Can you build an app in a month?

Rarely. A very small app with a fixed scope can launch in about 4–6 weeks if decisions are quick and the store accounts already exist. Most apps with accounts, payments and an admin panel take 3–4 months.

How long does it take to build an MVP?

A tightly scoped MVP with one core feature, sign-in and a simple backend usually takes 1–2 months. An MVP with two kinds of users and payments, like a marketplace, takes longer. Some teams launch on one platform or as a web app first.

Does building for iOS and Android double the time?

Not with a cross-platform codebase like React Native. Both apps come from the same code, so the extra time is mostly platform-specific features, testing and store setup. Separate native apps need more engineering, though two teams can work in parallel.

How long does it take to get a D-U-N-S number in Australia?

For Apple, allow up to 5 business days for Dun and Bradstreet to issue the number. Apple can then take up to 2 more business days to see it, before it verifies your company. Google says a new number can take up to 30 days. The number is free.

Why does my app need 12 testers before it can go on Google Play?

Google applies this to personal developer accounts created after 13 November 2023. They must run a closed test with at least 12 testers opted in for 14 days in a row. You then apply for production access, which Google says usually takes 7 days or less to review.

How long does it take to update an app after launch?

A small fix may reach users within a few days, depending on testing and store review. Apple reviews 90% of submissions in under 48 hours. Google reviews can take longer. A bigger feature goes through design, build and testing again.

Is a fixed launch date realistic?

Yes, if the scope can flex. Agree the date, then rank features so the lowest ones move to phase 2 if time runs short. Plan at least 2 weeks between submission and launch as a buffer for App Review.

Sources

  1. Apple: App Review
  2. Apple: App Review Guidelines
  3. Apple: D-U-N-S Number
  4. Apple: Enrolling in the Apple Developer Program
  5. Apple: Upcoming requirements
  6. Apple Newsroom: App Store 2025 fraud and review figures
  7. Google Play: Testing requirements for new personal accounts
  8. Google Play: Organisation account requirements
  9. Google Play: Android device verification
  10. Google Play: Prepare for review times
  11. Google Play: Target API level requirements
  12. Google Play: Managed publishing
  13. OAIC: Transparency for AI and automated decisions
Proof

One we built.

Our own app · iOS, Android, web

Pantry Pic

Our own app. Pantry Pic detects what’s in your fridge or pantry, suggests meals you can cook tonight and keeps the grocery list under control.

Ingredients recognised
120K+
Personalised recipes served
35K+
App Store rating in Australia
4.6★
Read the case study →
Free consultation

Want a timeline for your app?

You’ll hear back from Dylan, not a sales team. Reply within one business day, AEST.

Reply within one business day.
Free, no obligationGet an estimate →